echoloc

TransnetBW GmbH Tech Stack

Transmission system operator managing Germany's regional power grid infrastructure

Utilities Stuttgart, Baden-Württemberg 1,001–5,000 employees Founded 1998 Public Company

TransnetBW operates the electricity transmission grid serving 11 million people across Baden-Württemberg, running a hybrid cloud footprint (AWS + Azure) with containerized Java/Kotlin services (Spring Boot, Docker, Kubernetes) backed by distributed databases (PostgreSQL, Cassandra, MySQL). Active projects span AC-to-DC network conversion, ultranet/suedlink high-voltage buildouts, and asset lifecycle management tooling — reflecting a capital-intensive infrastructure operator modernizing legacy grid control systems while managing contract lifecycle and early-risk identification across mission-critical operations.

Tech Stack 60 technologies

Core StackJira SAP AWS Docker Kubernetes Java Kotlin C# React Angular PostgreSQL MySQL Cassandra JavaScript AutoCAD Revit Splunk ITIL Microsoft 365 SharePoint Visio Azure Spring Boot NET Core Git HTML CSS Microsoft Office Microsoft Project Signavio+29 more

What TransnetBW GmbH Is Building

Challenges

  • Ensuring network security and system stability
  • Managing contract lifecycle
  • Maintaining high-voltage network
  • Expanding network to meet demand
  • Continuous governance improvement
  • Optimizing asset lifecycle management
  • High-voltage network optimization
  • Efficient transmission grid operation
  • Maintaining stable data management operations
  • Identifying risks early

Active Projects

  • Suedlink
  • Future-proof platform solutions for grid control
  • Network construction projects
  • Dc network build
  • Umbau des ac-netzes
  • Ac to dc network conversion
  • Asset management system development
  • Concepts for lifecycle management of network assets
  • Analysis tool development
  • Hgü-bauprojekte (ultranet, suedlink)

Hiring Activity

Steady90 roles · 30 in 30d

Department

Engineering
38
Ops
25
Construction
7
Data
3
Finance
3
Security
3
Logistics
2
Procurement
2

Seniority

Senior
29
Mid
26
Intern
15
Manager
13
Junior
3
Lead
1
Company intelligence

Find more companies like TransnetBW GmbH by tech stack, pain points and active projects

Get started free

About TransnetBW GmbH

TransnetBW is the transmission system operator (TSO) responsible for operating, maintaining, planning, and expanding the electricity grid across Baden-Württemberg. The company ensures 24/7 power supply reliability to approximately 11 million residents and sustains regional industrial production. Founded in 1998 as a public company, it operates from Stuttgart with 1,001–5,000 employees. The organization balances grid expansion (new AC/DC network segments, ultranet/suedlink projects), asset management (lifecycle planning for high-voltage infrastructure), and operational stability (network security, data management, risk identification) across a heavily regulated energy sector.

HeadquartersStuttgart, Baden-Württemberg
Company Size1,001–5,000 employees
Founded1998
Hiring MarketsGermany

Frequently Asked Questions

What tech stack does TransnetBW use?

TransnetBW runs Java, Kotlin, C#, Spring Boot, .NET Core, React, and Angular across cloud (AWS, Azure, Docker, Kubernetes). Data tier includes PostgreSQL, MySQL, and Cassandra. Enterprise tooling: SAP, Microsoft 365, Jira, Splunk, AutoCAD, Revit.

What is TransnetBW working on?

Major projects include suedlink (ultranet high-voltage transmission), AC-to-DC network conversion, grid control platform modernization, network asset management system development, and lifecycle management optimization for high-voltage infrastructure.

Similar Companies in Utilities

Other companies in the same industry, closest in size