Regional electricity distribution network operator serving 2.4M properties
SP Electricity North West operates the North West England electricity distribution grid, serving 2.4 million properties across an 11kV–132kV network. The tech stack is Azure + SAP + Power Platform–centric, typical of regulated utilities, but the hiring mix reveals a shift: 41 engineering roles (mostly mid-level and junior) against just 1 sales headcount, paired with active apprenticeship programs and projects in smart-grid development and low-carbon connections. This signals investment in technical capability—both hands-on field talent and systems capability—to handle network modernization under regulatory pressure.
Notable leadership hires: SAP HR Systems Lead
SP Electricity North West owns and operates the electricity distribution network across North West England, delivering power to 2.4 million properties. The company is regulated and carries responsibility for network safety, reliability, and compliance. Over the next eight years, it is investing £1.9 billion in network maintenance, upgrades, and infrastructure modernization. Current priorities include smart-grid development, fault reduction, carbon emissions reduction, and safe high-voltage connection schemes across the 11kV, 33kV, and 132kV networks. The organization operates a 24-hour contact centre and manages a portfolio of construction, maintenance, and feasibility projects alongside apprenticeship pipelines for linesperson and cable jointing roles.
Azure, SAP, Power Platform (Power Apps, Power BI), ETAP, Primavera P6, AutoCAD, and Microsoft Office. SAP SuccessFactors handles HR systems. PRINCE2 and ITIL are process frameworks in use.
Smart-grid development, low-carbon technology connections, fault-location techniques, carbon emissions reduction, energy efficiency improvements, and construction/maintenance projects across 11kV, 33kV, and 132kV networks. Two apprenticeship programs (linesperson and cable jointing) are active.
Other companies in the same industry, closest in size