Large-scale renewable energy operator with 1.2 GW installed capacity across Greece
TERNA ENERGY operates 1,224 MW of installed renewable capacity across wind, solar, hydro, and hybrid projects in Greece, with a pipeline toward 6 GW by 2029. The tech stack—SCADA, DIgSILENT PowerFactory, HEC-RAS, PVSyst, and SAP—reflects a capital-intensive asset management operation focused on grid integration and field optimization. Active hiring is heavily engineering-skewed (13 of 15 open roles), with a notable split between mid-level technical positions and senior-level problem-solving, suggesting both execution scaling and specialized technical gaps in project delivery.
TERNA ENERGY is Greece's largest independent renewable energy producer, operating a diversified portfolio of wind farms, solar parks, hydroelectric facilities, and hybrid projects. Founded in 1997, the company has built 1,224 MW of operational capacity and is executing a multi-gigawatt expansion plan through 2029. The business spans project development, construction, and long-term operations and maintenance across Greece. Current pain points center on maintenance cost optimization, compliance with evolving energy regulations and ISO standards, and managing schedule and budget risk across large construction pipelines—typical friction points for asset-heavy renewable operators.
TERNA ENERGY uses SCADA for remote monitoring, DIgSILENT PowerFactory for grid studies, PVSyst for solar simulation, HEC-RAS for hydraulic modeling, and SAP for enterprise resource planning across operations.
Yes. TERNA ENERGY has 13 active engineering roles open (of 23 total), predominantly mid-level and senior positions. All hiring is currently in Greece.
TERNA ENERGY currently operates 1,224 MW of installed capacity across wind, solar, hydro, and hybrid projects in Greece, with plans to reach 6 GW by 2029.
Other companies in the same industry, closest in size