Infrastructure operations and maintenance for energy and industrial sites
px Group operates critical energy and industrial infrastructure across the UK and Europe, running a 24/7 maintenance and operations business anchored by gas processing facilities and the Saltend Chemicals Park. The tech stack—Maximo, SAP ByDesign, SCADA, Primavera P6—reflects a capital-heavy, compliance-driven operation; active projects cluster around CMMS workflow implementation, plant commissioning, and equipment standardization, while pain points center on COMAH regulatory compliance, operational risk management, and cybersecurity on industrial control systems—suggesting the organization is modernizing asset-management practices while balancing safety-critical requirements.
px Group is a fully integrated infrastructure solutions provider operating energy and industrial facilities across the UK, Ireland, and Gibraltar. The company manages two of the UK's largest gas processing facilities and owns Saltend Chemicals Park in the Humber, a hub for chemical manufacturing and the site of Equinor's hydrogen production plant with carbon capture. Operations run on a 24/7 basis and span asset management, engineering, project delivery, and consultancy. The business is backed by Ara Partners, a private-equity firm focused on industrial decarbonization. With 501–1,000 employees, px Group is predominantly engineering and operations-focused, with active hiring across maintenance, capital projects, and specialized technical roles.
px Group uses Maximo (asset management), SAP ByDesign (ERP), SCADA and DCS (process control), Primavera P6 (project scheduling), STAAD Pro and Tekla Structures (structural engineering), and standard Microsoft Office tools. This combination reflects an industrial-operations and asset-heavy infrastructure business.
Key projects include CMMS workflow implementation, commissioning new plants, startup/shutdown services, equipment standardization, LOPA (Layer of Protection Analysis) implementation, and inspection/replacement of corrosion-under-insulation pipework. The focus reflects modernization of maintenance processes and regulatory compliance across industrial sites.
Other companies in the same industry, closest in size