PORR Polska executes large-scale infrastructure, railway, and building projects across Poland as part of the international PORR group. The tech stack reveals a mature, project-centric operation: enterprise CAD (AutoCAD, Revit, Civil 3D, Tekla), project controls (Oracle Primavera, Microsoft Project), and ERP (SAP). Active adoption of BIM signals a shift toward model-driven delivery — critical for complex underwater tunnels and national transport corridors currently underway. Pain points cluster around contract and cash-flow management, areas where better data integration across Primavera, SAP, and BIM tools could unlock immediate operational gains.
PORR Polska is a public construction firm headquartered in Warsaw, operating as the Polish subsidiary of the international PORR group. The company specializes in infrastructure, building construction, railway, civil, industrial, and hydrotechnical projects. Recent portfolio includes major national projects: underwater tunnel construction between Uznam and Wolin islands, S3 corridor expansion (Czech Republic to Baltic), and expansion of Poland's largest LNG port in Świnoujście. The organization employs 1,001–5,000 people and is actively hiring across construction, engineering, operations, and support roles, with a seniority mix skewed toward mid-level and manager positions.
Oracle Primavera and Microsoft Project for scheduling and controls; SAP for ERP; AutoCAD, Revit, Civil 3D, Tekla, and Bentley suite for design and BIM; ProjectWise for document management.
Underwater tunnel between Uznam and Wolin islands; S3 corridor expansion (Czech Republic–Baltic connection); LNG port expansion in Świnoujście; railway line modernization; thermal waste conversion facility; design-build infrastructure contracts.
Other companies in the same industry, closest in size