EPC firm designing and building utility-scale solar installations across the US
Melink Solar is a 15-year-old engineering, procurement, and construction firm focused on commercial and utility-scale solar projects (100 kW to 30 MW). The tech stack—Bluebeam, AutoCAD, Microsoft Project, Smartsheet, Sage—reflects a construction-heavy operation prioritizing project visualization and financial controls. Hiring is senior-weighted (5 of 8 open roles) concentrated in construction and engineering, with active pain points around project delays, budget overruns, and vendor management, suggesting the company is scaling delivery capacity and operational rigor as projects grow larger.
Melink Solar designs, builds, and maintains solar photovoltaic systems for commercial enterprises, developers, and utilities across the United States. The company operates as a full-service EPC: handling system design and engineering, material procurement, on-site construction, and post-installation monitoring. Project scale ranges from rooftop installations to 30 MW ground-mounted and canopy arrays. The firm is headquartered in Cincinnati, Ohio, and has deployed over 275 MW of installed capacity since 2009. Clients span Fortune 100 companies to mid-market businesses seeking renewable energy and net-zero transitions.
Melink Solar designs and installs solar systems from 100 kW to 30 MW, across rooftop, ground-mounted, and solar canopy configurations.
The company uses Bluebeam for project visualization, AutoCAD for design, Microsoft Project and Smartsheet for scheduling, Sage for financial management, and CMMS for monitoring.
Melink Solar is based in Cincinnati, Ohio, and hires exclusively in the United States.